In development Community beta target Q1 2027 View roadmap

Roadmap · engineering gates

A measurable path from repository baseline to distributed scale.

Phases advance only when the engineering gate passes. Dates are targets, not commitments.

0

Phase 0 — Repository Verification and Architecture Baseline

Pin upstream source and licenses, run the supported checks, agree adapter contracts and record architecture decisions.

Gate: Verified upstream repository source does not mean ANDIP implementation is complete.

VERIFIED SOURCE
1

Phase 1 — Single-Server MVP

Create a local control API, durable state, one worker, a deterministic mock agent, artifact capture and cleanup.

Gate: A restart-safe vertical slice; planned, not reported as delivered.

PLANNED
2

Phase 2 — Multi-Agent Execution on One Server

Add resource reservation, concurrency caps, cancellation, and isolated workspaces for parallel tasks.

Gate: No overcommit and per-attempt workspace separation must be demonstrated.

PLANNED
3

Phase 3 — Distributed Execution Across Multiple VPS

Add worker enrollment, heartbeat, capacity placement, cordon/drain, durable leases and fencing.

Gate: Multi-VPS behavior and safe worker-loss reassignment require tests.

PLANNED
4

Phase 4 — Security, Reliability, Recovery, and Budget Controls

Add scoped secrets, checkpoints, approval/audit, cost metering and failure-recovery scenarios.

Gate: Isolation, recovery and hard budget controls require reproducible validation.

PLANNED
5

Phase 5 — Browser Integration and Mixed Workloads

Integrate an optional browser adapter, isolated profiles, policy hooks, verification and multiple resource classes.

Gate: Approved-site scenarios and browser profile isolation require validation.

PLANNED
6

Phase 6 — 100-Agent Concurrency Validation

Run repeatable load scenarios, separate mock concurrency from real model/browser workloads, inject failures and publish raw evidence.

Gate: 100 Concurrent Agents — Engineering Validation Target. No pass is claimed.

TARGET
7

Phase 7 — Community Beta and Commercial Readiness

Prepare installation, upgrade, backup/restore, security and license review, runbooks and beta readiness.

Gate: Community Beta Planned for Q1 2027; commercial readiness remains conditional.

TARGET
Planned Community Beta — Q1 2027

Development milestones and beta availability are targets and may change as engineering validation progresses. No fixed launch date within Q1 2027 is announced.

100 Concurrent Agents — Engineering Validation Target

A reproducible test must distinguish simulated processes, live model requests and browser sessions; it must record actual RUNNING attempts, queued tasks, external quotas and failure scenarios.

Phase 0 status refers to verification of upstream repository source in the audit—not delivery of ANDIP platform components. All later platform phases remain planned unless fresh project evidence demonstrates otherwise.